Hang on while we load the rest of the page...
 
 

Holcomb Bridge Road Corridor Study Kicks Off

The city has scheduled a public information open house.

 

Roswell's transportation department will hold the first of three public information open houses on the Holcomb Bridge Road Corridor Study next week.

The study area extends along Holcomb Bridge Road (State Route 140) from Warsaw Road to Holcomb Woods Parkway and includes the interchange with State Route 400. It will build upon the Imagine Roswell 2030 Comprehensive Plan and the Big Creek Bridge Road Study, which was completed in 2010. 

The HBR Corridor Study will focus on addressing traffic congestion, tying land use and transportation together, as well as aesthetic improvements. It will also develop transportation improvement concepts and both interchange beautification and streetscape concepts. 

City staff will present the study’s vision and goals, preliminary short-term transportation improvement concepts and initial aesthetic concepts to residents. The goal of the study is to generate consensus on improvement projects, which may be implemented in both the short-term and long-term.

Local residents are encouraged to attend any one of the public meetings. Those who are unable to attend a meeting may go online for further information and to take the input survey.

The first public meeting takes place Tuesday, Aug. 30 from 5 p.m.-8 p.m. at the Doubletree Hotel, 1075 Holcomb Bridge Road. 

Related Topics: Holcomb Bridge Road, Study, and Transportation

Leave a comment

 
 
 
 

Your town. Mobilized.

Download Patch for iPhone or Patch Places for Android.

Learn more 

Own a local business?

Stay in touch with customers by claiming your free Patch listing.

Learn more 

Advertise on Patch

Build community trust in your local brand with game-changing tools for any budget.

Learn how