Politics & Government

Holcomb Bridge Road Corridor Study

Public information open house scheduled.

Roswell held a public information open house on the Holcomb Bridge Road Corridor Study (HBR/400).

The meeting was on Monday, April 16, 2012 from 5 p.m.-8 p.m., and was the second of three public meetings.

City staff presented the preliminary long-term transportation improvement concepts, including two new interchange configurations. The study area extended along Holcomb Bridge Road (SR 140) from Warsaw Road to Holcomb Woods Parkway and included the interchange with SR 400. The study built upon the and the Big Creek Bridge Road Study completed in 2010.

Find out what's happening in Roswellwith free, real-time updates from Patch.

The HBR/400 Corridor Study focused on addressing traffic congestion, tying land use and transportation together, and aesthetic improvements. It also developed transportation improvement concepts as well as interchange beautification and streetscape concepts. The goal of the study was to generate consensus on improvement projects which may be implemented in both the short-term and long-term.


Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.

We’ve removed the ability to reply as we work to make improvements. Learn more here